Construction&Project Management

Manage Your Construction&Project With TOLOKA

Documentation preparation and constant project supervision play a magnificent rule in construction. TulOKA General Contractor&Builder provides our clients with a team of architects and specialists who will lead you to the world of perfect construction&project management.

We differentiate three basic levels of your building realization:

  • Documents registration/obtaining

First of all, you have to confirm legally that the land or the house is yours. The chief architect signs the sketch – the set of drawings with the dimensions of the building, its configuration, footprint, vulume, function, efficiency, and environmental suitability.

  • Acquiring permission for building

Our specialists draw up more detailed plans of the building with more construction indicators. At this point, your future design is transformed into a particular material object.

  • Independent estimating and commissioning

To fill your house with electricity, plumbing, and other necessary communications, you need a connection allowance. It is issued based on a complete package of construction documentation with architectural, engineering, fireman, and other approvals.

When the paperwork is finished, we can start a fascinating construction process enhanced by the best project management from TulOKA General Contractor&Builder.

The Basic Steps Of Proper Project Management

Construction project management implies basic project management principles and practices. It has a clearly defined beginning and endpoint with many limiting factors, like time, budget, human resources, weather, etc.

A person who controls the whole construction process and is fully responsible for the result is the construction project manager

. These are the most common tasks they resolve:

  • Calculates and estimates project costs
  • Completes a project budget
  • Sets up the execution schedule
  • Communicates and cooperates with other project participants
  • Educates workers about project specifications
  • Supervises further building process
  • Performs risk assessments

Construction project management may differ depending on the building type (residential or commercial, for example). However, TOLOKA General Contractor&Builder realizes the following basic steps of project management:

Communication and Discussion Stage

The project starts when all main participants gather to conceive an idea, research solutions for the problems a client states, and establish the first set of actions and deadlines. Then, there are three fundamental questions to be discussed by a customer, a construction manager, engineers, and architects: feasibility of the project, design schematics, contract documents.

Pre-design

Our team includes into this step not only work with the design tools. Pre-design usually means pre-construction. That’s why we complete such tasks as site examination, soil testing, formation of the project schedule, assembling preparation materials, etc.

Sketch creation

TOLOKA General Contractor&Builder advises to pick our 3D rendering service and get the best design sketch of your building. Be sure, every detail will be flawless. Our architect has accomplished dozens of projects and is an experienced construction specialist.

Design execution

When the design is approved, plans are set, working team and materials are ready, it’s time to turn blueprints into reality. We inform our clients that they have a risk assessment included in the project plans, and in case of any misunderstandings, our workers follow the procedure to fix them.

Commissioning

Every communication system is tested, any errors are fixed. TOLOKA General Contarctor&Builder documents the entire process of evaluation and commissioning for your record.

Start of occupancy&warranty period

Once you move into the building, it’s time for the warranty to become valid. Our customers own two types of warranty: contractural (regarding the systems and structural integrity of the building) and implied (legally stated warranties concerning the building).

TOLOKA General Contractor&Builder always empathizes that transparency and sincerity are our key working principles. We value our customers and want them to be satisfied with every project.

Main Aspects Of Construction Budget Planning

Planning a construction budget is a tremendous task for professional construction project managers—changes in site conditions or price market demand to adjust plans suddenly. TOLOKA General Contractor&Builder is ready to set a proper construction budget with the help of qualified estimators and reliable subcontractors. We thoroughly pre-plan any surprises and include them in the estimating building costs.

The construction budget incorporates about 30 percent of intangible expenses (that are not directly related to a building project) and approximately 70 percent of “brick and mortar” expenses (associated with the physical construction).

GET IN TOUCH

Contact Us

TOLOKA GENERAL CONTRACTOR & BUILDER

  • Address in Calgary: 43 Bridlecrest Blvd SW, Calgary, AB, T2Y4X9 Canada
  • Address in Vancouver: 1500 West Georgia St, Suite 1300 Vancouver, BC, V6G 2Z6

Call Us Now